GEC

ICO Ended
158 days 0 hour ago

Description

GEC GreenEnergyCoin is a blockchain project focused on the energy sector of the global economy in the field of "Green Energy" - the production of electricity from renewable energy sources. GEC is a product of the investment class blockchain. It is a derivative that uses both advanced financial and industrial technologies to produce and sell a product with high demand. Such a product is electricity that is consumed and sold in the markets of countries that have a permanent deficit in the generated capacity and are dependent on its imports. GEC is a blockchain project that combines investors who have decided to finance the construction of Solar Power Plants (SPP) by the crowdfunding model to get income from their usage.

General
ICO Dates
15 Oct 2018 - 15 Dec 2018
Whitelist / KYC
Country
The Netherlands
Ticket
GEC
Token Type
ERC20
Available for Sale
Financial
ICO price
1 GEC = 0.12 USD
Accepting
ETH, BTC, Fiat
Soft Cap
37M $
Hard Cap
163M $
Team
Mr. Sergii Ivanov
Chief Executive Officer
  • 1
    04.2018

    • Decision-making on the creation of a project for the construction of network solar power plants (SPP) in various regions of the World. Development of the concept and business plan.

  • 2
    05. 2018

    • Development of a legal and business model for the GreenEnergyCoin project (GEC) in different jurisdictions, in different regions of the World.

  • 3
    06. 2018

    • Negotiation with all project participants. • Development of a model of partnership between project participants. • Decision on issuing its own crypto currency (token) - GreenEnergyCoin (abbreviated - CEG)

  • 4
    07. 2018

    • Team building. Team building. Technical audit of the GreenEnergyCoin project (GEC). • Definition of favorable regions of the World, for the construction of network solar power plants (SPP).

  • 5
    08. 2018

    • Start the development of a business project for the construction of three (3) network solar power plants (SPP) in Croatia, with a total capacity of 150 MW per hour.

  • 6
    09. 2018

    • Preparation for pre-sale - PreICO tokens GreenEnergyCoin (GEC). • Marketing program in preparation for presale - PreICO of GreenEnergyCoin (GEC) tokens.

  • 7
    10. 2018

    • End of the marketing program in preparation for presale - PreICO of GreenEnergyCoin (GEC) tokens. • Start presale - PreICO of GreenEnergyCoin (GEC) tokens.

  • 8
    11. 2018

    • Continuation of presale - PreICO GreenEnergyCoin (GEC) tokens. • The end of registration of Green Energy Holding in Croatia, within the framework of the GreenEnergyCoin project.

  • 9
    11. 2018

    • Continuation of presale - PreICO GreenEnergyCoin (GEC) tokens. • The end of registration of Green Energy Holding in Croatia, within the framework of the GreenEnergyCoin project.

  • 10
    12.2018

    • End of PreICO of GreenEnergyCoin (GEC) tokens. • The planned receipt of investments from pre-sale - PreICO GreenEnergyCoin (GEC) tokens in the amount of sixteen (16) million EUR.

  • 11
    01.2019

    • Supply of equipment and components required for the construction of a grid solar power plant (SPP ): South Adriatic-I, 15 MW / h, under the GreenEnergyCoin project (GEC).

  • 12
    02.2019

    • Start of public sale - ICO of GreenEnergyCoin (GEC) tokens. 24 • Development of design and design estimates for the construction of a solar power plant (SPP ): "South Adriatic-II", 100 MW / h and "North Adriatic-I", 35 MW / h

  • 13
    03.2019

    • Beginning of construction and installation works for grid solar power plants (SPP): "South Adriatic-II", 100 MW / h and "North Adriatic-I", 35 MW / h

  • 14
    04.2019

    • Completion of construction and installation works of the network solar power plant (SPP ): "South Adriatic-I", 15 MW / h. • Connection of grid solar power plants (SPP ): "South Adriatic-I", 15 MW / h, to the energy networks of Croatia.

  • 15
    05.2019

    • Commissioning of a grid solar power plants (SPP ): "South Adriatic-I", 15 MW / h, with reaching the designed capacity. • Completion of construction and installation works for grid solar power plants (SPP)

  • 16
    06.2019

    • Commissioning of grid solar power plants "South Adriatic-II", 77 MW / h, and "North AdriaticI", 35 MW / h with their reaching the designed capacity.

  • 17
    07.2019

    • Starting from 01.07.2019, all three (3) grid solar power plants "South Adriatic-II", 100 MW / h, "North Adriatic-I", 35 MW / h, and "South Adriatic-I", 15 MW / h are fully commissioned and areunder full operation with using full production capacity.